A REPORT ON THE ENTERPRISE RISK MANAGEMENT PLAN OF MH GROUP HOLDINGS

A risk is an event or condition that, if it occurs, may produce positive or negative effects on a company’s objectives. The risk management process therefore identifies, assesses, controls, monitors and reports the exposures that an entity faces. This report defines the exposures associated with MH group; how they will be identified, assessed and managed and also outlines how the risk management activities will be performed, recorded and monitored on a regular basis.
This report is presented by the Risk Manager to the Board of directors on the risk management analysis of the following entities of the group; MHA, USA-based professional baseball team and the Canadian textile manufacturing and distributing entity. The steps for accomplishing this are outlined in the following sections. The focus has been to identify pure risks rather than speculative risks. Government regulations and natural catastrophes??

1) Risk Identification and assessment for MHA
The risk identification process entails the evaluation of environmental and operational factors as well as the organisational structure. Information is gotten from the financial reports, audit report, industry reports, site visits, employee questionnaires and contracts/agreements with contractors and suppliers.
The holding’s revenue has tripled since 2001; a detail examination of loss histories would add valuable information to risk management analysis.
The assessment process is done by determining the frequency of occurrence and severity of the losses, if they occur. Prioritisation is done to ascertain what control measures to use for the various risks that have been identified.

The following loss exposures have been identified;

Pollution from highly toxic hazardous waste. Exposure could lead to environmental contamination (which causes illnesses)…...

Similar Documents

Risk Register

...Developing a Risk Register What is a risk register? The risk register lists all the risks identified at the beginning and during the life of a project or undertaking, their grading in likelihood of occurring and seriousness of impact on the project, initial plans for mitigating each high level risk, and subsequence results. It usually includes: • A unique identifier for each risk • A description of each risk and how it will affect the project • An assessment of the likelihood it will occur and the possible seriousness/impact if it does occur (low, medium, high) • A grading of each risk according to a risk assessment table (refer to table 1) • Who is responsible for managing the risk • An outline of proposed mitigation actions (preventative and contingency). The Register should be maintained throughout the project and will change regularly as existing risks are re-graded in the light of the effectiveness of the mitigation strategy, and new risks are identified. In smaller projects the risk register is often used as the risk management plan. Why would you develop a risk register? A risk register is developed to: • Provide a useful tool for managing and reducing the risks identified before and during the project • Document risk reduction and management strategies • Provide those involved with or supporting the activity with a documented framework from which risk status can be reported • Ensure the communication......

Words: 897 - Pages: 4

Jit1 Risk Register

...------------------------------------------------- TASK 1A. RISK REGISTER OF TARRANT COUNTY HOSPITAL OF NORTH TEXAS Risk | Description | Owner | Source | Likelihood of Occurrence* | Severity of Impact* | Controllability* | Typhoon*global risk | Typhoon strikes Japanese supplier of latex gloves. The hospital gets ¾ of its latex gloves from this Japanese company because of cost efficiency. The typhoon floods Japanese supplier thus halting production of gloves which can cause hospital to run low on latex gloves | Japanese supplier’s CEO | Natural Disaster | Low to medium; will most likely occur during typhoon season; on average typhoons, historically, in Japan are not severe enough to cause this type of delay because supplier is located far enough inland | Low to medium; will depend on the size of the typhoon as well as direct or indirect impact | Low; hospital has low control over this situation because it is a natural disaster; hospital can suggest ideas to supplier to help prevent a total shut down due to typhoon | Patient Slip/Falls | Patients slip and fall while in the care of the hospital staff | Chief Medical Officer of hospital | Hospital nurses and patient technicians | Medium as patient needs to get up for bathroom or required exercise | High; if there is a slip/fall in the hospital, there is potential for injuries and legal ramifications | High; written policy in place to handle patients and their needs as well as staff training on patient safety | ......

Words: 2022 - Pages: 9

Risk Register Ohs

... | | |Protective clothing & equipment records | | |MSDS available | | |Health & safety systems manual | | |H&S representatives appointed | | |Management safety representative appointed | | |Contract risk assessment available | | |Contract Health & Safety Co-ordination Plan available | | |Housekeeping | |Work areas free from rubbish & obstructions | | |Surfaces safe and suitable | | |Free from slip/trip hazards ...

Words: 912 - Pages: 4

Risk Analysis

...Hu  1   Yinping  Hu   Marketing  Management  2101   Professor  Stefan  Lippert   18  April  2014   Ontela  PicDeck  Case  Study   Project  Goal   To  determine  the  most  appropriate  target  customer  segment  in  order  to  maximize  growth   opportunities  for  both  Ontela  and  its  direct  customers—wireless  carriers,  who  wants  to   decrease  churn  and  increase  average  revenue  per  user.   Qualitative  Study   Persona  Analysis   Persona   Age   Gender   Household   Occupation   Tech.   Aptitude     Sarah   42   Female   Three  children     Parent   LOW   (Email,  Google,  and   occasionally  IM  that   were  set  up  for  her)   Mindset   Product   Usage   Customer   Needs     No  interest  in  new   technologies   Move  pictures  to  free   up  camera  memory   • Simplicity     • Speed   Steve   27   Male   Single   Real  Estate  Agent   MEDIUM   (Uses  email  at  work  but   prefers  the  traditional   way  in  doing  business)   Passive  in  updating   technologies   Send  pictures  directly   to  clients   • Simplicity     • Convenience   Regina  ......

Words: 2659 - Pages: 11

Risk Analysis

...Introduction “The key is not to eliminate risk; it is to measure it and manage it wisely” (Steiger, Strong, & Wilson, 2009). In the world of finance, the most difficult objective to achieve for individuals, corporations, and small businesses is the balance between financial risk and reward. This paper will look at both historical tools and avenues modern technology has adopted to create a balance for financial investors in the market today and how these tools are implemented in today’s businesses. Identifying opportunities and recognizing the risk associated with them is crucial to financial growth and success. Entities are continuing to find ways of leveraging risk by using different modeling tools to understand the source of risk, measure risk and transfer risk (Schwartz, 1996). Due to the expansion and growth of companies into new markets, risk has become an increasing concern for many businesses. It is clear through the recent market crash that more robust risk management tools must evolve with the changing investment practices that are taking place in today’s society. “The world’s financial markets have exploded with new products and new techniques such as derivatives and securitizations giving rise to huge new markets” (Epetimehin, 2012). If implemented strategically and used correctly, risk management tools can aid businesses in their journey of financial success and help them develop finely tuned investment planning and business strategies (Anonymous,......

Words: 2301 - Pages: 10

Risk Analysis

...chemical processing, liquid transfer, heating and cooling and sprinkler/fire protection systems. SELF-PRIMING PUMPS This type of pump does a good job as long as the supply of liquid flows to the pump. Put the “Standard Centrifugal Pump” above the liquid, and problems can arise, as it does not have the ability to create a vacuum and prime itself. Should it pump the hole dry and air enter the pump, it will stop pumping and become airbound. A centrifugal pump operates on the same principle except the tire is called an impeller and it has blades to move the water. PUMPING AIR-BOUND AIR However, we can’t have water going in all directions at once, so we direct it by means of a casing, or volute (pronounced va-loot) as it is called in the pump industry. The volute acts in the same manner as your car fender; it controls the water after it leaves the impeller. Accessory equipment must be used to evacuate entrained air within the pump, such as an eductor, a hand primer, etc. On construction jobs there is a need for a pump which has the ability to prime itself repeatedly, since the purpose of the pump is to keep the hole dry. As a result, the pump must lower the water below the strainer inlet time and time again, handling large amounts of air at the same time. A pump capable of repriming is a must. Page 1 TYPES OF PUMPS IN USE TODAY Here is how it works: During the priming cycle, air enters the pump and mixes with water at the impeller. Water and air are discharged......

Words: 7367 - Pages: 30

Risk Register

...Contents of a Risk Register A risk register is a table that lists information about each of the risks you identify during the Identify Risks process. It includes a description of each risk, its potential impact, and its root causes. Information gathering sessions provide you with important information about project risks. However, if this information is not properly documented, it won't benefit the current project or serve as a useful resource for subsequent projects. To avoid this, it's important to record the output of the sessions in the risk register. New and more detailed information continues to be added to the risk register as other risk management and general project management processes are conducted. Tracking number, RBS, WBS, and date The first four columns in the register enable you to track each risk and its context throughout the project life cycle: • a tracking number uniquely identifies each recorded risk so it can be easily referenced and monitored. • the RBS column links each risk to its category within the risk breakdown structure. • the WBS column associates each risk with the work components it may affect within the work breakdown structure. • the Date column lists the date at which each risk was identified. Another identifying characteristic that could be included in the risk register is risk status, which could be recorded as pending, current, or ended. Description The Description column contains a clear and concise description of each......

Words: 567 - Pages: 3

Risk Register

...Name Professor’s / Tutor’s Name The Course Number 29 October 2015 Risk Register According to (Hulett, 123), is a master document prepared after drafting a risk management plan. A risk register is essential as it enables one to highlight certain risks, their severity, and the action to take to prevent the occurrence of the risk or even minimize its impact. In a risk management plan, various countermeasures are outlined in case the risk happens. These countermeasures are put in reducing the severity of the threat when it happens. A risk register is part of the risk management plan. In this paper, my interest is to prepare a risk register given then activities of my project. Date | 29th October 2015 | | Description of the risk | The problem may not be completed due to the scarcity of time and resources. Also different activities within the project might take long | | Risk Type | The risk we are facing is a project risk | This type is because we are undertaking to implement a project | Chances of occurrence | The likelihood of the risk to occur is medium | The percentage chance of happening is between thirty to seventy percent. | Severity of the risk | The risk will not be severe. Its effect will be moderate | This action will depend on measures adopted to minimize the impact of this risk. | Counter Measures | Contingency planning and adequate allocation of resources and time | Contingency planning will involve short-term plans as opposed to long-term......

Words: 303 - Pages: 2

Bus 519 Assignment 3: Risk Workshop and Risk Register ( Eqi in Siwa )

...BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA ) http://homeworklance.com/downloads/bus-519-assignment-3-risk-workshop-risk-register-eqi-siwa/ Due Week 6 and worth 240 points Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another. Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat. 4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment. 5. Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity. 6. Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this......

Words: 407 - Pages: 2

Risk Register

...Management VoIP Implementation-Risk Management Introduction: Risk is for all intents and purposes anything that debilitates or limits the capacity of a group or philanthropic association to accomplish its main goal. It can be startling and erratic occasions, for example, devastation of a building, the wiping of all our PC records, loss of stores through robbery or harm to a part then again guest who stumbles on a tricky floor and chooses to sue. Any of these or a million different things can happen, and on the off chance that they do they can possibly harm our association, money loss, or in a most dire outcome imaginable, cause your association to close. [1] Risk Management: Risk management is the procedure of distinguishing risk, surveying risk, and making moves to diminish risk to a worthy level. The risk management methodology decides the procedures, strategies, instruments, and group parts and obligations regarding a particular task. The risk management plan portrays how chance administration will be organized and performed on the venture. As an administration procedure, risk management is utilized to recognize and maintain a strategic distance from the potential cost, timetable, and execution/specialized dangers to a framework, take a proactive and organized way to deal with oversee negative results, react to them on the off chance that they happen, and distinguish potential open doors that may be covered up in the circumstance. The risk management approach and......

Words: 1755 - Pages: 8

Bus 519 Assignment 3: Risk Workshop and Risk Register ( Eqi in Siwa )

...BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA ) Follow Below Link to Download Tutorial http://homeworklance.com/downloads/bus-519-assignment-3-risk-workshop-risk-register-eqi-siwa/ For More Information Visit Our Website ( http://homeworklance.com/ ) Email us At: Support@homeworklance.com or lancehomework@gmail.com Due Week 6 and worth 240 points Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another. Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat. 4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment. 5. Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and......

Words: 432 - Pages: 2

Risk Analysis

...CRM Assignment | Risk Profile & Risk Map | | | | | | Corporate Risk Management Assignment Risk Profile Significance | Likelihood of Occurrence | Risk Type | Risk Definition | Risk Description | 10 | 5 | Operational Risk | Aviation fuel price risk | ATF cost represents the largest category in airlines operating expenses and place the airline stability at long term risks. The prices of ATF have risen significantly in one & half year and constitute nearly 40% of ticket prices. | 9 | 5 | Market Risk | Hedging risk | Current high prices and the volatility in the prices of the fuel is making hedging strategy very difficult to implement | 9 | 5 | Personnel risk | Operational risk | Airline engineers strike recently and competitive offerings of the competitors is placing a strategy risk in front of the top management as the increase in the personnel cost can further increase the pressure on the operating margins of the airline. | 9 | 5 | Market Risk | Competition risk. | Airline industry is highly competitive in nature and with air travel becoming a commodity business, being competitive on price is key for the survival of any airline. | 8 | 5 | Exchange rate risk | Market risk | Airline has its payables in many currencies and with the volatility in the exchange rates airline is exposed to exchange rate risk | 7 | 4 | Economic risk | Market risk | Ongoing recession In US has cut deeply into profits of the airline and has raise questions......

Words: 479 - Pages: 2

Risk Analysis

...Assignment 2: Industry and Risk Analysis BUS 521 Strayer University October 30, 2011 Industry and Risk Analysis There are many risks involved in the new business venture. Entering into the business industry can be a hit or miss and having a business plan to ensure you are targeting the right audience and marketing the business to the proper market can help ensure the business stays on track. Future Outlook and Industry Trends for the New Venture After assessing the future outlook growth potential for bakery businesses it has shown that it is steadily rising by 1% each year. With over half of Americans loving desserts more and more of these types of businesses are being produced. Since London is such a high tourist area, the locals as well as tourists will be able to partake in the desserts from around the world. These types of businesses are becoming more popular in America and attract people from all walks of life. The new venture will allow this type of business to expand globally so that others are able to taste the delectable sweets that Good Eats International Bakery has to offer. Sweet Sentiments Bakery, a budding idea for a classic bakery, is in the making for a local soon-to-be small business owner. Known for creating sweet and moist desserts, Ms. Lesley has spent years trying to find the perfect little bakery. Previously Ms. Lesley has created her baking goods within her own home and now plans to share her classics to others for a......

Words: 1350 - Pages: 6

Risk Analysis

...The Risk of Living in a Riverside Home Riverside, California is a playground for anthropologists studying risks. Being centered next to three major highways makes Riverside a corridor for freight businesses and poses as a convenient location for many other companies. Thinking about risks in Riverside led me to research the risks prevalent in low income homes and neighborhoods in Riverside. These neighborhoods are located toward the city center and/or near industrial zones. Low income properties provide sufficient risk analysis due to their age and condition which generally leads to neglect of the property. This can be contrasted against newer, higher income homes which are placed in areas secluded from the city center and away from industrial sites. Another reason why I chose to study low income homes and neighborhoods was due to the many risks that affect them outside of their vicinity. Pollution, social inequalities, traffic, and crime are examples of some environmental effects on these areas that contribute to them being labeled as “risky”. Exposing environmental and structural risks of low income areas can help explain disparities in society today. Incorporating books such as Flammable and Risk as well as other articles pertaining to risk, I attempt to enforce the idea of how the social construct of risk influences and upholds life in these homes and neighborhoods. Following social implications, I propose certain alternative methods of managing these risks. As a society,...

Words: 3729 - Pages: 15

Risk Register

...RISK REGISTER | Risk Identification | Qualitative Risk Assessment | Risk Response Plan | Ref. | Description of Risk | Consequences | Primary Objective | Likelihood(H-M-L) | Seriousness(H-M-L) | Managing or Mitigating Actions | Responsible Officer | 1. | Inspection happens at the construction site for checking permits or quality check | Any problem might cause delay in project. | Time | L | M | Take proper permits related with set up of building | Project Manager | 2. | Insufficient Material available | Insufficiency means additional time and raw material cost | Time | M | H | Quantity of the raw material required should be duly checked before and also at regular intervals so that at least delay can be avoided. | Project Manager | 3. | Shortage of labourers | This might increase the cost in two ways:-Introduce machinery-training cost of remaining working laborers | Cost | H | H | Try retaining labourers back by a nominal increase in wages or through productivity based incentives | Consultant | 4. | Difficulty in managing the overall cost | The financial differences would eventually increase the time as arrangement of remaining funds would stop the project for a while | Cost | H | H | Should Ensure that proper financial planning is done, and excess fund should be reserved for unforeseen contingencies | Project Manager | 5. | Maintaining......

Words: 260 - Pages: 2